News
26.05.2025
The construction of Utilitas’ wastewater and seawater heat pump plant and seawater pumping station to be built in Paljassaare began today. The...
News
26.05.2025
In the first quarter of 2025, the companies of the Utilitas energy group in Estonia and Latvia produced 714 GWh of green...
News
22.05.2025
Utilitas is building a 1100 MWh heat storage facility in the Väo energy complex in Tallinn, which will enable to harmonize daily...
News
28.03.2025
The Supervisory Board of AS Utilitas Tallinna Soojus has decided to simplify the structure of the Tallinn district energy companies and merge...
News
14.03.2025
Based on the results of thorough surveys carried out over two years in the initial development area of the Saare-Liivi offshore wind...
News
05.03.2025
Noise studies commissioned by Utilitas Wind and carried out by the Health Board showed that the noise from the wind turbines of...
News
05.03.2025
Utilitas, Estonia’s largest producer of renewable energy, produced 2.6 TWh of energy in 2024, 72% of which came from renewable sources. The...
News
26.11.2024
At the TOP 100 awards gala of Estonian biggest business news portal Äripäev, which took place on 21 November, Utilitas, the largest...
News
01.11.2024
On November 1 Latvia’s largest wind energy producer Utilitas Wind opened the first utility-scale battery energy storage battery system in Latvia with...
News
31.10.2024
Utilitas produced a total of 195 GWh of energy in the third quarter, of which 51% was electricity and 49% was heat....
News
17.10.2024
On October 17, in Telšiai County, Lithuania, the cornerstone was laid for a wind farm comprising 20 modern wind turbines. The construction...
News
22.08.2024
The companies of the energy group Utilitas in Estonia and Latvia produced 425 GWh of energy in the second quarter of 2024,...